five

MEX-M-MRS-1-2-3-EXT3-3429

收藏
esdcdoi.esac.esa.int2025-01-21 收录
下载链接:
http://esdcdoi.esac.esa.int/doi/html/data/planetary/MARS-EXPRESS/MEX-M-MRS-1-2-3-EXT3-3429.html
下载链接
链接失效反馈
官方服务:
资源简介:
Data Set Overview The Mars Express (MEX) Radio Science (MaRS) Data Archive is a timeordered collection of raw and partially processed data collected during the MEX Mission to Mars. For more information on the investigations see the MaRS User Manual MARSUSERMANUAL2004 in the MaRS DOCUMENT/MRS_DOC folder. This is a Global Gravity measurement covering the time 20121214T04:20:36.000 to 20121214T08:03:09.500. This data set was collected during the MEX Extended Mission Phase 3 (EXT3) 2010 to 2012. This is a measurement of the Global Gravity field of Mars. Global gravity measurements were typically done when Mars Express was around Apocenter. There were four types of scientific measurements conducted during Extended Mission: Solar Conjunction, Occultation, Bistatic Radar and Gravity where one has to distinguish between gravity measurements conducted on Phobos as well as global gravity measurements on Mars which were conducted around apocenter and target gravity measurements on Mars which were conducted around pericenter over interesting geophysical structures. For more information see INST.CAT or the MaRS User Manual MARSUSERMANUAL2004. For all measurements if not indicated otherwise Transponder 1 onboard the s/c was used. Transponder 2 is designed to be a backup. Mission Phase Definition It should be noted that the Mars Express (MEX) Radio Science (MaRS) group uses mission phases which deviate from the ones defined in the MISSION.CAT files given by ESA in order to keep the keywords and abbreviations consistent for Mars Express, and Rosetta. For Venus Express other definitions are used. Those mission phase abbreviations are also used in the data description field of the dataset_id. MaRS mission name | abbreviation | time span Near Earth Verification | NEV | 20030602 20030731 truncated!, Please see actual data for full text [truncated!, Please see actual data for full text]

数据集概览:火星快车(Mars Express,简称MEX)无线电科学(MaRS)数据存档是一组按时间顺序排列的原始及部分处理数据,这些数据是在火星快车任务期间收集的。关于调查的更多信息,请参阅MaRS用户手册MARSUSERMANUAL2004,位于MaRS文档/MRS_DOC文件夹中。这是一组覆盖时间20121214T04:20:36.000至20121214T08:03:09.500的全局重力测量数据。该数据集是在MEX扩展任务阶段3(EXT3)2010至2012年间收集的。这是对火星全局重力场的测量。全局重力测量通常在火星快车接近远地点时进行。在扩展任务期间进行了四种类型的科学测量:日食、掩星、双站雷达和重力测量。在此过程中,需要区分在火卫一上进行的重力测量、在火星上的全局重力测量(在远地点附近进行)以及针对火星上特定地理结构进行的近地点重力测量。更多详细信息请参阅INST.CAT或MaRS用户手册MARSUSERMANUAL2004。对于所有测量,除非另有说明,否则使用在卫星上的应答器1进行。应答器2设计为备份。任务阶段定义:需要注意的是,火星快车(MEX)无线电科学(MaRS)小组使用的任务阶段与ESA提供的MISSION.CAT文件中定义的任务阶段有所不同,以便保持火星快车和罗塞塔的关键词和缩写的一致性。对于金星快车,则使用其他定义。这些任务阶段的缩写也用于数据集ID的数据描述字段。MaRS任务名称 | 缩写 | 时间范围:近地验证 | NEV | 20030602 - 20030731 [截断!请参阅实际数据以获取完整文本][截断!请参阅实际数据以获取完整文本]。
提供机构:
European Space Agency
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作