遇见数据集

Table- 3.1. Water abstraction calculation based on lean period in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ

收藏
Zenodo2025-11-27 更新2026-05-26 收录
官方服务:

资源简介:

Table-3.1. Water abstraction calculation based on lean period Sl. No.Particulars of Power Plant and otherAmount of Waterindustries at Project area1210MW thermal power plant,8.5 m3/sec; onceSiddhirganj, Narayanganjthrough methodcooling.2Pendakar 450MW CCPP, Haripur,10.5 m3/sec; onceNarayanganjthrough cooling.19 m3/sec; oncethrough cooling,Sub Totalwhich is being backto the river again.3NEPC 110MW BMPP, Haripur,0.03 m3/sec (appx)Narayanganj4Particle Board and others, Haripur,2 m3/sec (appx);Narayanganj5Proposed 360MW CCPP, Haripur,13.88 m3/secNarayanganj(appx) for make upwater6Proposed Siddhirganj 450MW CCPP,14 m3/sec (appx) forSiddhirganj, Narayanganjmake up water29.91 m3/sec (appx) forSub Totalmake up waterGrand Total48.91 m 3 /sec (appx)

提供机构:
World Bank (WB)
创建时间:
2025-11-27
二维码
社区交流群
二维码
科研交流群
商业服务