Unit cost and number of flexible containers for clean-up phase of decontamination for different method considered in the present analysis.
收藏Figshare2015-12-02 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/_Unit_cost_and_number_of_flexible_containers_for_clean_up_phase_of_decontamination_for_different_method_considered_in_the_present_analysis_/1079829
下载链接
链接失效反馈官方服务:
资源简介:
aNumber of flexible containers used to store contaminated wastes generated by removal phase. The volume of a container is assumed to be 0.9 m3 and the cost of a flexible container is assumed to be 8,000 JPY/unit.bThe cost of the temporary storage per flexible container is assumed to be 20,000 JPY/unit.c Obtained from Fukushima [10].d Obtained from JAEA [11]. For the decontamination cost for F1, the unit cost was estimated considering the slope angle of the area based on the report.