five

DataSheet1_Material Based Penalty-Cost Quantification Model for Construction Projects Influencing Waste Management.PDF

收藏
NIAID Data Ecosystem2026-03-13 收录
下载链接:
https://figshare.com/articles/dataset/DataSheet1_Material_Based_Penalty-Cost_Quantification_Model_for_Construction_Projects_Influencing_Waste_Management_PDF/19235283
下载链接
链接失效反馈
官方服务:
资源简介:
The Construction and demolition (C and D) waste generation is a critical issue for the construction industry, which negatively affects the economy, environment, and society. This study estimates the penalty-cost based on the produced C&D wastes in steel and concrete skeleton projects. Field survey and the BOQ data were collected from five concrete and four steel skeleton projects. The difference of materials used and wastes generated between concrete and steel skeleton projects were evaluated statistically (ANOVA and Welch and Brown-Forsythe). A financial analysis was implemented for estimating the penalty cost. The study outcomes demonstrate that the amount of waste that construction managers estimated is significantly lower than the actual amount generated. Furthermore, 0.055% of the total project cost of a penalty was estimated based on the waste produced at construction sites. In the end, the estimated penalty was validated by comparing it with the six recent completed projects. The penalty calculated in this study could save the project cost and reduce the C&D waste. As a result, imposing the estimated cost as a penalty would force construction managers to think thoroughly about the generated C&D waste problems. This study also has a novelty and will add to the body of knowledge by using penalty-cost quantification model to save project-cost of construction material-based-waste, and it can be further explored by adopting more quality data and engaging different construction materials.
创建时间:
2022-02-25
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作