five

Data underlying the research of Distributed assembly flexible job shop scheduling problem with flexible assembly

收藏
4TU.ResearchData2022-01-06 更新2026-04-23 收录
下载链接:
https://data.4tu.nl/articles/_/17878508/1
下载链接
链接失效反馈
官方服务:
资源简介:
According to the numbers of product and processing factory, 35 sets of data are formed, which conform to the distributed assembly flexible job shop scheduling problem with flexible assembly. Among them, the number of processing factory ranges from 2 to 8, and the number of product ranges from 2 to 6, 6 to 10, 10 to 14, 14 to 18, 18 to 22, 22 to 26 and 26 to 30. In addition, the data in each sheet represents a scale. The basic unit of measurement for all data is "1".

本数据集基于产品数量与加工厂数量生成共计35组数据,所有数据均适配带柔性装配的分布式装配柔性作业车间调度问题(Distributed Assembly Flexible Job Shop Scheduling Problem with Flexible Assembly)。其中,加工厂数量的取值范围为2至8,产品数量则涵盖2~6、6~10、10~14、14~18、18~22、22~26与26~30共七个区间。此外,每个工作表对应一组实验规模参数,所有数据的基本度量单位均为“1”。
创建时间:
2022-01-06
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作