five

Work rate, work done above CP and duration of both parts of the two experimental trials.

收藏
Figshare2015-12-03 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/_Work_rate_work_done_above_CP_and_duration_of_both_parts_of_the_two_experimental_trials_/1557813
下载链接
链接失效反馈
官方服务:
资源简介:
* Significantly different to THREE (P$ Significantly different to predicted by the model (P&& Significantly correlated (PWork rate, work done above CP and duration of both parts of the two experimental trials.
创建时间:
2015-12-03
二维码
社区交流群
二维码
科研交流群
商业服务