Data for: Socio-economic and environmental life cycle assessment of complete streets
收藏NIAID Data Ecosystem2026-03-13 收录
下载链接:
http://datadryad.org/dataset/doi%253A10.25338%252FB85K99
下载链接
链接失效反馈官方服务:
资源简介:
“Complete streets” is a design concept for primarily urban streets and intersections (existing and/or new) intended to encourage active transportation by bicyclists and pedestrians by making streets safer, convenient, and attractive for active transportation; motorized transportation and parking are also accommodated in the design concept. The social and economic performance indicators included in the social LCA (SLCA) framework that was used in this project provide a great deal of insight into specific and different potential benefits of a given complete streets project. The SLCA framework is based on five categories of concerns and 17 performance measures or indicators. The indicators were tested in the project and evaluated for final recommendations for use in future studies. The results are compared with the existing streets that were configured to be vehicle-centric. The case studies were solicited in more and less advantaged neighborhoods so that the equity aspects of the framework could also be evaluated. Use of the CalEnviroScreen tool from the California Environmental Protection Agency was also investigated to assess the exposure of neighborhoods and their vulnerability to environmental impacts in conjunction with the performance indicators when evaluating the potential benefits for disadvantaged neighborhoods. The document presents the data that was used for the SLCA, environmental LCA, and CalEnviroScreen Tool.
Methods
The three case studies that are evaluated include projects that are in an urban, a suburban, and a suburban/rural area. These projects are:
San Fernando complete street project located in an advantaged neighborhood of San Jose, CA (urban)
Franklin Boulevard complete street project located in a disadvantaged neighborhood of Sacramento, CA (suburban)
Kentucky Avenue complete street project located in Woodland, CA (suburban/rural)
The San Fernando Street and Kentucky Avenue complete street projects were already built at the time of evaluation, therefore this study includes calculations for social performance indicators before and after the projects' completion. Franklin Boulevard complete street project assessment, on the other hand, is based on proposed design documents as this street has not been built yet.
The social performance measures that are selected to be used in this report are presented in Table 1. All performance measures description, methodologies, and data resources are explained in the final report for each case study.
Table 1. Social performance measures selected for use in the proposed complete streets LCA framework.
Selected Category
Selected Performance Measures
Accessibility
Access to Community Destinations
Access to school
Jobs
Access to Jobs
Job Creation
Mobility/Connectivity
Active Transportation to Local and Regional Transit Connectivity Index*
Connectivity Index
Bike/Pedestrian Delay
Level of Service (Auto)
Safety/Public Health
Level of Service (Bicycle Level of Service)
Level of Service (Pedestrian level of Service)
Level of Service (Bicycle Level of Stress)
Crashes
Physical Activity and Health
Vehicle Miles Traveled (VMT) Impacts
Pedestrian Miles Traveled (PMT)
Bicycle Miles Traveled (BMT)
Livability
Green Land Consumption
Street Trees
The main challenges in the SLCA study were data collection and the inherent context-specific and qualitative nature of social aspects of each complete street project. The evaluations of performance measures have been interpreted and discussed for each case study separately. All the performance measures were quantified for the three case studies using project-specific data. Assumptions, modeling approaches, and performance measures descriptions and methodologies are explained and available in the final report for each case study. The references to the data sources are also cited in the final report. Data that were used to quantify indicator results are presented in this data summary report. There is no restriction to publishing data, except for the schools’ surveys; however, the results of the survey are published in the final report.
Datasets
The following part of this document contains a data summary for each case study. Each case study, Social LCA for San Fernando St., Franklin Blvd., and Kentucky Ave., has its own directory containing excel files that are described in the following paragraphs. The summary of percentile rankings for environmental and public health burdens and populations for neighborhoods near complete streets from CalEnviroScore is presented in Table 2. The data for environmental LCA for all three case studies are also available as an excel file in this dataset.
San Fernando St. Complete Street Case Study
The “San Fernando Street history of complete streets projects.xlsx” excel file compares the elements of the complete street considered in this case study.
The access to destinations data for San Fernando Street is shown in the “San Fernando-List of destinations.xlsx” excel file.
The “San Fernando-Access to jobs-Non-government Office Workers.xlsx” and “San Fernando-Access to jobs-State Workers.xlsx” excel files represent the access to jobs data for San Fernando Street for the non-governmental office workers and state workers, respectively.
The Urban, Transit, Bicycle, and Pedestrian Level of Services (LOS) data for San Fernando Street are shown in “San Fernando-Urban LOS.xlsx” and “San Fernando-Transit LOS, BLOS, PLOS.xlsx” excel files.
The “San Fernando- Crashes.csv” file, includes crashes data, and belongs to the complete list of San Jose streets and different modes of transportation between 2014 and 2019.
Social LCA Franklin Blvd. Complete Street Case Study
The access to destinations data for Franklin Blvd. is shown in the “Franklin-List of Destinations 2019 and 2015.xlsx” excel file.
The “Franklin-Access to jobs-Non-government Office Workers.xlsx” and “Franklin-Access to jobs-State Workers.xlsx” excel files represent the access to jobs data for Franklin Blvd. for the non-governmental office workers and state workers, respectively.
The Urban, Transit, Bicycle, and Pedestrian Level of Services (LOS) data for Franklin Blvd. are shown in “Franklin-Urban LOS.xlsx” and “Franklin-Transit LOS, BLOS, PLOS.xlsx” excel files.
Social LCA Kentucky Ave. Complete Street Case Study
The access to destinations data for Kentucky Ave. is shown in the “Kentucky-List of Destinations.xlsx” excel file.
The “Kentucky-Access to jobs.xlsx” excel file represents all the access to jobs data for Kentucky Ave.
The Urban, Transit, Bicycle, and Pedestrian Level of Services (LOS) data for Kentucky Ave. are shown in “Kentucky -Transit LOS, BLOS, PLOS.xlsx” excel file.
CalEnviroScreen Data
Table 2. Summary of percentile rankings for environmental and public health burdens and populations for neighborhoods near complete streets from CalEnviroScore.
Complete Street
Zip code
Neighborhood ID number
0.5 or 2.0 mile distance
CalEnviroScore percentile (%)
Population
San Fernando St.
95110
6085500300
0.5
55-60
3140
95110
6085500800
0.5
60-65
2600
95112
6085501000
0.5
70-75
4769
95192
6085500901
0.5
55-60
3723
95112
6085501200
0.5
60-65
4186
95128
6085502102
2
55-60
7469
95126
6085502002
2
70-75
4887
95128
6085502001
2
50-55
5022
95126
6085500500
2
30-35
5275
95050
6085505203
2
55-60
4809
95110
6085505100
2
65-70
3027
95110
6085500300
2
55-60
3140
95126
6085500400
2
40-45
2369
95126
6085500600
2
35-40
4586
95126
6085501900
2
50-55
4641
95125
6085502302
2
10-15
2826
95125
6085502301
2
30-35
3245
95126
6085502201
2
25-30
6260
95125
6085503121
2
70-75
4499
95112
6085503122
2
85-90
3449
95112
6085503112
2
70-75
4025
95122
6085503105
2
90-95
2484
95122
6085503117
2
75-80
3120
95122
6085503110
2
80-85
4618
95116
6085501501
2
75-80
4278
95116
6085501402
2
60-65
2947
95116
6085501401
2
75-80
3295
95112
6085501200
2
60-65
4186
95131
6085504318
2
85-90
5265
95133
6085503601
2
85-90
2992
95133
6085504319
2
70-75
6936
95133
6085503709
2
65-70
5088
95116
6085503707
2
50-55
5462
95116
6085503602
2
80-85
4741
95116
6085503710
2
70-75
3599
95116
6085503711
2
60-65
4763
95122
6085503105
2
90-95
2488
95110
6085500300
2
55-60
3140
95112
6085501101
2
55-60
4074
95112
6085501000
2
70-75
4769
95110
6085500800
2
60-65
2600
95116
6085501502
2
70-75
4549
95110
6085503113
2
75-80
4760
95112
6085503112
2
70-75
4025
Franklin Blvd.
95822
6067003501
0.5
50-55
2629
95820
6067003600
0.5
65-70
2826
95818
6067002500
0.5
10-15
1587
95820
6067003700
0.5
75-80
4219
95822
6067003501
2
50-55
2629
95818
6067002400
2
30-35
4387
65818
6067002200
2
90-95
4004
95818
6067002300
2
35-40
3156
95818
6067002000
2
85-90
2376
95816
6067001500
2
30-35
4329
95817
6067001800
2
70-75
4686
95817
6067001700
2
55-60
4794
95822
6067003502
2
50-55
2916
95822
6067004100
2
65-70
5015
95823
6067004903
2
70-75
6740
95823
6067004701
2
85-90
3303
95823
6067004702
2
90-95
4945
95824
6067004601
2
75-80
7614
95824
6067003202
2
60-65
5052
95820
6067004401
2
75-80
4122
95820
6067002900
2
55-60
4499
95819
6067001600
2
20-25
5421
Kentucky Ave.
95776
6113011206
0.5
60-65
7329
95695
6113010901
0.5
40-45
5311
95776
6113010800
0.5
55-60
3881
95695
6113011001
2
35-40
6464
95776
6113011206
2
60-65
7329
95776
6113010800
2
55-60
3881
95695
6113011002
2
10-15
3093
Environmental LCA
“ELCA of complete street case studies.xlsx” file contains several tabs with data that were used for LCA for the three case studies. The data in the excel file includes the surface treatments, complete street specifications, data for changes in VMT, as well as data for the materials and construction stages for San Fernando St., Franklin Blvd., and Kentucky Ave. case studies, and guidelines used for the calculations.
创建时间:
2022-07-20



