遇见数据集

Hydro Corridor

收藏
ArcGIS Hub2026-05-15 更新2026-08-04 收录
官方服务:

资源简介:

The hydrocorridor is based on the location of utility lines. Hydro One has control rights over the lands within the transmission corridor on the Symons Campus. This corridor contributes to Hydro One"s ability to deliver safe, reliable, and affordable electricity throughout the Province. Hydro One has the primary right to use the corridor lands for transmission and distribution purposes and hold a statutory easement under the Reliable Energy Consumer Protection Act. Hydro One offers a Provincial Secondary Land Use Program, which permits public use of the corridor in a manner that does not restrict the continued operation and maintenance of the Hydro Corridor. The proposed meadow-way in the Trent Lands and Nature Areas Plan is a compatible use, identified in Hydro One"s Provincial Secondary Land Use Program, and will require consultation with and approval from Hydro One.

本水电廊道(hydrocorridor)以公用设施线路的走向为布设基础。Hydro One对西蒙斯校区(Symons Campus)内输电廊道范围内的土地享有管控权,该廊道助力Hydro One实现全省范围内安全、可靠且经济实惠的电力供应。Hydro One享有将廊道土地用于输电与配电用途的首要使用权,并依据《可靠能源消费者保护法》(Reliable Energy Consumer Protection Act)持有法定地役权。Hydro One推出了省级二级土地使用计划(Provincial Secondary Land Use Program),允许公众以不影响水电廊道持续运维的方式使用该廊道。《特伦特土地与自然区域规划》(Trent Lands and Nature Areas Plan)中提议的草甸步道(meadow-way)属于该计划认定的兼容用途,且需与Hydro One进行磋商并获得其批准。

创建时间:
2025-05-22
二维码
社区交流群
二维码
科研交流群
商业服务