遇见数据集

Table 1 - 1 in 21 - MSK-JOR-ENV - Preliminary Risks Assessment and ESIA for the Aqaba-Amman Water Desalination and Conveyance (AAWDC) Project (Jordan) - Renewable Energy Component

收藏
Zenodo2025-11-27 更新2026-05-26 收录
官方服务:

资源简介:

Table 1-1: Project Proponents EntityRoleMinistry of Water and IrrigationClient and owner of the Project.BOT ContractorThe contractor who is responsible for designing, implementing,and operating the project, as well as updating the ESIA asneeded and developing the detailed management plans requiredduring construction and operation.European Investment Bank andThe funding agencies that financed the ESIA and the preliminaryUSAIDdesign,, responsible to ensure the project is in line with theirenvironmental and social standardsAqaba Special Economic ZoneThe governmental entity responsible for approving theAuthority (ASEZA)Environmental Impact Assessment (EIA) and issuing theenvironmental permit for the RE component as it is located withinits jurisdiction.CDM SmithThe consultant responsible for the Project’s preliminary design.

创建时间:
2025-11-27
二维码
社区交流群
二维码
科研交流群
商业服务