five

data publication

收藏
NIAID Data Ecosystem2026-05-01 收录
下载链接:
https://data.mendeley.com/datasets/56dpt49dwh
下载链接
链接失效反馈
官方服务:
资源简介:
this data article explores the criteria that affect the precision of estimating the cost of sports projects from the perspective of engineers at the Iraqi Ministry of Youth and Sports. The data was obtained by using qualitative and quantitative research methods were adopted in collecting and analysing the data. Based on the literature review, a questionnaire was prepared and then distributed to Engineering of the Iraqi Ministry of Youth and Sports, as the sample size reached 44 individuals. The findings reveal that the top 15 affecting criteria out of fifty-five are: repetition, difference in construction value, additional work (change orders), precision of tables of quantities, continuous updating of the design requirements for sports stadiums according to FIFA conditions, clarity of drawings and specifications, labour cost, economic situation, type of sports fields (international or local), duration of the project, building materials prices, type of contract, equipment cost, sports field location, experience and skill level of the appraiser, Project documentation are complete, and the cost data and details are complete. Competence and leadership of the project manager. The data can provide an original perspective on the concept of cost estimation accuracy as it relates to project efficiency based on a literature review and empirical evidence.
创建时间:
2024-02-06
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作