five

Underway Sulfur Dioxide measurements from R/V Tangaroa cruise VDT0410 in the South East of New Zealand, S.W. Bounty Trough in 2004 (SAGE project)

收藏
DataONE2016-08-20 更新2024-06-26 收录
下载链接:
https://search.dataone.org/view/sha256:795999b814d52511400e71265added2920fb9bffcd7fd960f54e26ac3fde7c0c
下载链接
链接失效反馈
官方服务:
资源简介:
<p>Underway Sulfur Dioxide Measurements<br /> <br /> <b>Notes on Sulfur Dioxide Measurements made during the SAGE Cruise; 27 March to 15 April 2004</b><br /> Measurements were made using an HPLC technique: <br /> Saltzman, E.S., Yvon, S.A. and Matrai, P.A. 1993. Low-level atmospheric sulfur dioxide measurement<br /> using HPLC/fluorescence detection. J. Atmos. Chem., 17, 73-90 <br /> <br /> Measurements commenced on 01 April 2004<br /> The following days there were no measurements made:<br /> 02 April 2004<br /> 07 April 2004 <br /> 08 April 2004 <br /> 10 April 2004 <br /> 11 April 2004 <br /> 12 April 2004 <br /> <br /> On these days either the weather was too bad for operation or deployment of the<br /> ship meant that sampling of the stack was highly likely. The inlet of the instrument<br /> was on the seaward side of the Atmospheric Container lab and it was imperative to<br /> ensure that seawater did not enter the inlet, since seawater would have acted as<br /> a sink for sulfur dioxide and would have damaged the nafion drier beyond repair.<br /> In poor weather waves were breaking over the container occasionally, the instrument<br /> was not operated in such conditions.<br /> <br /> 13 April 2004 was a dedicated &quot;Atmospheric&quot; day and sampling ran for 12 hours,<br /> commencing at 04:15am, to obtain pre-dawn levels of sulfur dioxide.<br /> <br /> The cleanest days of the cruise, when the measurements were not significantly affected<br /> by ship emissions were 09 April and 13 April. 09 April 2004 was the cleanest day with<br /> all measurements likely to be from clean background air <br /> <br /> A further assessment of how clean samples were, will be made using the CN data at a later stage.<br /> <br /> The inlet was at a height of 2m from the deck and 1m from the rail. </p>
创建时间:
2021-12-05
二维码
社区交流群
二维码
科研交流群
商业服务