five

TAT data for plos one.

收藏
Figshare2025-06-13 更新2026-04-28 收录
下载链接:
https://figshare.com/articles/dataset/TAT_data_for_plos_one_/29316934
下载链接
链接失效反馈
官方服务:
资源简介:
IntroductionDelivery delays of laboratory results can result in death and/or economic loss to both the patient and the health system. Data is limited regarding turnaround time for tuberculosis testing in Cameroon. We evaluated intra- turnaround time in tuberculosis diagnosis, identified root causes, and brainstormed solutions to improve patient satisfaction.Materials and methodsIn this cross-sectional descriptive study, turnaround time for the pre-analytic phase was set at 3 hours, the analytic phase at 11 hours, and the post-analytic phase at 10 hours. The overall turnaround time was 24 hours. We used the Fishbone method of problem analysis involving the personnel of the Tuberculosis Reference Laboratory-Douala, to identify root causes. We brainstormed using the “Whys” causes of turnaround time failure during the process of tuberculosis diagnosis by GeneXpert MTB/RIFResultsWe analyzed samples from 526 clients. The median turnaround time was 45 (Range: 2-120) hours. A total of 216(41.1%) clients had a turnaround time failure. The turnaround time failures in the pre-analytic, analytic, and post-analytics phases were 64(29.6%), 128(59.3%), and 12(11.1%) respectively. Overall, 19 root causes of turnaround time failure were identified and grouped into six categories, namely: equipment, administration, technical-staff, environment, material, and method. Equipment maintenance (defective or non-calibrated modules) was the critical cause of turnaround time failures accounting for 86 (39.8%) of the overall turnaround time failure.Conclusionturnaround time in tuberculosis diagnosis is longer than expected, retarding patient care management. Focusing on equipment maintenance enhances the intra-laboratory testing process, thus improving overall patient satisfaction. The need for further studies to incorporate the extra-laboratory turnaround time in assessing the overall turnaround time is imperative.
创建时间:
2025-06-13
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作