Power at Zone (15Min Avg) MOOREBANK
收藏data.endeavourenergy.com.au2024-06-12 更新2025-01-09 收录
下载链接:
https://data.endeavourenergy.com.au/explore/dataset/power-at-zone-15min-avg-moorebank/
下载链接
链接失效反馈官方服务:
资源简介:
Historical interval demand data (in megawatts) at Moorebank Substation Please note The data in these files is the sole property of Endeavour Energy, and we retain all copyright and intellectual property. We accept no liability for the use of this data by any organisation for any purpose. The data is raw data from Endeavour Energy's System Control and Data Acquisition (SCADA) and metering systems and has not been analysed, assessed or validated for accuracy or quality. No warranty or guarantee is provided as to the data's suitability for any particular purpose as it may: contain occasional metering errors that have led to gaps in the data have spikes and dips in metered load caused by switching of the network include estimates about demand due to different types of metering equipment at respective sites have been withheld for confidentiality reasons in accordance with clause (g) of Rule 5.13A, such as where a substation predominantly supplies large individual customers. If you would like to download demand data for all substations at once please use this dataset. Further enquiries Enquiries or feedback can be sent to Asset-information@endeavourenergy.com.au. Please include your name, organisation and the relevant contact details in your email.
历史时段内摩尔班克变电站的电力需求数据(以兆瓦为单位),请注意,本数据文件属Endeavour Energy独家所有,并保留全部版权及知识产权。我们对任何组织因任何目的使用该数据所产生的一切责任概不承担。数据来源于Endeavour Energy的系统控制和数据采集(SCADA)以及计量系统,未经分析、评估或验证其准确性或质量。对于数据是否适用于特定目的,我们不提供任何保证或担保,因为数据可能包含偶尔的计量错误,导致数据出现间断;可能因网络切换引起计量负荷的峰值和谷值;可能因不同类型的计量设备在各自地点的估算需求而包含估算数据;可能根据规则5.13A的第(g)款出于保密原因而被保留,例如变电站主要向大型个体客户提供电力的情况。如需一次性下载所有变电站的需求数据,请使用此数据集。如有进一步咨询,可通过Asset-information@endeavourenergy.com.au发送咨询或反馈,请在邮件中包含您的姓名、组织以及相关联系信息。
提供机构:
data.endeavourenergy.com.au



