Changes to the road layout in 1982, as part of the 'Stoke Bridge and approaches' road scheme, involved the demolition of property fronting the west side of St Peter's Street at its junction with Greyf
Daten der Wetterstation Güterbahnhof Heiliger Weg alle 10 Minuten vom 01.01.2009 - 23.04.2009.23.04.2009 – 26.05.2009 Umzug vom Güterbahnhof Heiliger Weg 58 auf das Dach des Umweltamtes - Brückstr. 45
Drawing index and drawings sheets from excavation of the 2017 trench at Aldborough Roman Town, North Yorkshire. The trench was excavated to investigate the north range of the Roman Forum, in order to