Survey data underlying the publication: Machine Learning for Construction Delay Prediction: A Model Built on Statistically Validated Key Factors
收藏官方服务:
资源简介:
The purpose of the study was to determine the causes of construction delays in Russia. The data was obtained by interviewing specialists on a 5-point scale on 32 previously identified factors.
提供机构:
4TU.ResearchData创建时间:
2025-05-20



