HPGR simulation from piston-die tests with an itabirite ore
收藏Figshare2017-03-01 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/HPGR_simulation_from_piston-die_tests_with_an_itabirite_ore/7512299
下载链接
链接失效反馈官方服务:
资源简介:
Abstract The Minas Rio project, owned by Anglo American, has HPGRs in open circuit operated as a tertiary/quaternary crushing stage. Currently this type of equipment is designed from HPGR tests on laboratory scale and pilot scale tests. This paper presents a methodology for simulating HPGR from piston-die tests on laboratory scale and a mathematical model developed in Hacettepe University in Turkey. The parameters determined from the results of the piston-die tests were used to validate the HPGR testing on pilot scale. Finally, the model was used to predict the particle size distribution in the HPGR product on industrial scale.
创建时间:
2017-03-01



