Milestone progress of the HEPS booster commissioning

收藏
DataCite Commons2025-04-27 更新2025-05-18 收录
下载链接:
https://www.scidb.cn/detail?dataSetId=a6745153b1894841bcf4cf84b5c570f6
下载链接
链接失效反馈
官方服务:
资源简介:
The high-energy photon source (HEPS) is the first fourth-generation synchrotron light source facility in China. The HEPS injector consists of a linear accelerator (Linac) and a full energy booster. The booster captures the electron beam from the Linac and increases its energy to the value required for the storage ring. The full-energy beam could be injected to the storage ring directly or after “high-energy accumulation.” On November 17, 2023, the key booster parameters successfully reached their corresponding target values. These milestone results were achieved based on numerous contributions, including nearly a decade of physical design, years of equipment development and installation, and months of beam commissioning. As measured at the extraction energy of 6 GeV, the averaged beam current and emittance reached 8.57 mA with 5 bunches and 30.37 nm.rad with a single-bunch charge of 5.58 nC, compared with the corresponding target values of 6.6 mA and 35 nm.rad, respectively. This paper presents the physical design, equipment development, installation, and commissioning process of the HEPS booster.
提供机构:
Science Data Bank
创建时间:
2023-12-30
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作