Forty-one (41) factors related to cost overrun on construction projects were extracted from 37 journals, through literature research. Structured questionnaires designed with both open-ended questions
Abstract This study investigated the use of building information modelling (BIM) integrated with the logics of the Last Planner system in construction planning and control in building projects. The ai