Long lead ENSO forecast
收藏Figshare2021-10-15 更新2026-04-08 收录
下载链接:
https://figshare.com/articles/dataset/Long_lead_ENSO_forecast/16817572/1
下载链接
链接失效反馈官方服务:
资源简介:
A wavelet-based variance transformation framework was used to obtain transformed predictor variables, and the dynamical linear model was applied to forecasting ENSO over long lead times (up to 24 months) using these transformed predictors .
提供机构:
Jiang, Ze创建时间:
2021-10-15



