Round 1 Solicitation Electric Fuel Corridor Groups (updated December 2023)
收藏California State Geoportal2026-03-28 收录
下载链接:
https://gis.data.ca.gov/maps/1a14bfb4957044008a062e2bf4b6288c
下载链接
链接失效反馈官方服务:
资源简介:
<span style='font-family:"Avenir Next W01", "Avenir Next W00", "Avenir Next", Avenir, "Helvetica Neue", sans-serif; font-size:16px;'>This layer includes the groups for Round 1 of California's NEVI Funding Program.</span><div style='font-family:"Avenir Next W01", "Avenir Next W00", "Avenir Next", Avenir, "Helvetica Neue", sans-serif; font-size:16px;'><br /></div><div style='font-family:"Avenir Next W01", "Avenir Next W00", "Avenir Next", Avenir, "Helvetica Neue", sans-serif; font-size:16px;'><b>Data Dictionary:</b><div style='font-family:inherit;'><ul><li><b>Corridor Segment </b>- A portion of a highway corridor.</li><li><b>Corridor Group </b>- A group of one or more corridor segments. </li><li><b>Alternative Fuel Corridor </b>- The U.S. Department of Transportation Federal Highway Administration (FHWA) designates a national network of plug-in electric vehicle (EV) charging and hydrogen, propane, and natural gas fueling infrastructure along national highway system corridors. To designate these Alternative Fuel Corridors (AFC), FHWA solicits nominations from state and local officials and works with other federal officials and industry stakeholders.</li><li><b>Minimum Sites </b>- The minimum number of project sites a corridor segment must have to be eligible for NEVI funding through California’s NEVI program solicitations. </li><li><b>Chargers Required </b>- The minimum number of new chargers a corridor segment must have to be eligible for NEVI funding through California’s NEVI program solicitations.</li><li><b>Required Sites </b>- Sites required along a corridor segment, if applicable. </li><li><b>Additional Note </b>- Additional notes as written in the Solicitation Manual, if applicable.</li></ul></div></div>
提供机构:
California State Geoportal



