Estimates of the Levelized Costs of Electricity (LCOE) for Existing Plants, New Construction with Optimistic Capacity Factors and New Construction based on Observed Capacity Factors, and Latest Estimates, Three Generating Asset Types ($US 2012/MWh).
收藏NIAID Data Ecosystem2026-03-09 收录
下载链接:
https://figshare.com/articles/dataset/Estimates_of_the_Levelized_Costs_of_Electricity_LCOE_for_Existing_Plants_New_Construction_with_Optimistic_Capacity_Factors_and_New_Construction_based_on_Observed_Capacity_Factors_and_Latest_Estimates_Three_Generating_Asset_Types_US_2012_MWh_/4274921
下载链接
链接失效反馈官方服务:
资源简介:
Estimates of the Levelized Costs of Electricity (LCOE) for Existing Plants, New Construction with Optimistic Capacity Factors and New Construction based on Observed Capacity Factors, and Latest Estimates, Three Generating Asset Types ($US 2012/MWh).
创建时间:
2016-12-01



