five

Realization of Maximum Flow in DTN and Application in CGR

收藏
DataCite Commons2023-06-13 更新2025-04-16 收录
下载链接:
https://ieee-dataport.org/documents/realization-maximum-flow-dtn-and-application-cgr
下载链接
链接失效反馈
官方服务:
资源简介:
The maximum flow problem based on contact graph in DTN is very important for routing and data planning. Common topological graphs with non-sequential changes include Dinic, ISAP and other deterministic algorithms for solving the maximum flow between two nodes. But these algorithms cannot be directly applied to topological networks with time series changes. At present, Iosifidis.G has given a solution to this problem based on the time expansion graph, but his method requires high storage space, and the increase in the number of nodes means increasing high time complexity accordingly. In this paper, we propose a method of dismantling and reconstructing the graph to solve the maximum flow problem in the continuously changing network. Compared with the SP algorithm of Iosifidis.G, this method does not require equal time slot splitting of each node, and uses discretization to reduce the scale of the graph.  Finally, we add this algorithm to CGR to optimize DTN data transmission, improve data delivery rate and reduce unnecessary link occupation. The experimental results show that the optimized CGR can increase by 3% on average delivery rate, reducing link usage by 4%.
提供机构:
IEEE DataPort
创建时间:
2023-06-13
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作