Two New Continuous-Time Models for the Scheduling of Multistage Batch Plants with Sequence Dependent Changeovers

收藏
NIAID Data Ecosystem2026-03-06 收录
下载链接:
https://figshare.com/articles/dataset/Two_New_Continuous_Time_Models_for_the_Scheduling_of_Multistage_Batch_Plants_with_Sequence_Dependent_Changeovers/3062578
下载链接
链接失效反馈
官方服务:
资源简介:
This paper presents two new multiple-time grid, continuous-time mixed integer linear program (MILP) models for the short-term scheduling of multistage, multiproduct plants featuring equipment units with sequence dependent changeovers. Their main difference results from the explicit consideration of changeover tasks as model variables rather than implicitly through model constraints. The former approach is more versatile in terms of type of objective function that can be efficiently handled (minimization of total cost, total earliness, and makespan), and despite generating larger mathematical problems, it is also a better performer in single stage problems. The latter is better suited for multistage problems, where the former approach has some difficulties even in finding feasible solutions, particularly as the number of stages increases. The performance of both formulations is compared to other MILP and constraint programming models. The results show that multiple-time grid models are better suited for single stage problems or, when minimizing total earliness, that the constraint programming model is the best approach for makespan minimization and that the continuous-time model with global precedence variables is the best overall performer.
创建时间:
2006-08-30
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作