five

Reed Canal basin stormwater improvement project through treatment wetland construction in South Daytona, Florida from 2017-10-01 to 2019-12-31

收藏
DataONE2026-02-24 更新2026-03-14 收录
下载链接:
https://search.dataone.org/view/sha256:59ccd42a69def5c56b3b9ca020379592cc50b68a1dfa944809af061196a408c1
下载链接
链接失效反馈
官方服务:
资源简介:
The dataset includes project design (engineering rendering), permit applications and approval documents, construction bids, photos of the retrofit installation and completion, the documents for public education through the Protect Our Lagoon Academy (POLA), the original proposal, matching funds documents, a promotional video, as well as the final report. In this project, an existing pond was modified by construction which involved removal of debris and litter, lowering of elevation of the pond, planting of flood tolerant native plants that could remove nutrients and monitoring water quality parameters. This project was leveraged to support the NOAA CCME II-supported students' MS thesis and BS senior project. links to the promotional videos/article of the project are https://www.news-journalonline.com/story/news/education/campus/2018/12/05/b-cu-students-work-to-improve-areas-waters/7104915007/ and https://www.youtube.com/watch?v=3VXIDndIbmw.
创建时间:
2026-02-25
二维码
社区交流群
二维码
科研交流群
商业服务