Dora Creek Floodplain Risk Management Study and Plan - Report
收藏Research Data Australia2025-12-20 收录
下载链接:
https://researchdata.edu.au/dora-creek-floodplain-plan-report/3815593
下载链接
链接失效反馈官方服务:
资源简介:
__Introduction__ \r\n\r\nThe Dora Creek Flood Risk Management Plan has been prepared for Lake Macquarie City Council (Council) in accordance with the NSW Floodplain Development Manual (April 2005 - Reference 1) and the August 2010 Flood Risk Management Guide – Incorporating sea level rise benchmarks in flood risk assessment (Reference 4) and:\r\n\r\n* Is based on a comprehensive and detailed evaluation of factors that affect and are\r\naffected by the use of flood prone land; \r\n* Represents the considered opinion of the local community on how to best manage its flood risk and its flood prone land; and \r\n* Provides a long-term path for the future development of the community. \r\n\r\nThe Dora Creek catchment is located on the western side of Lake Macquarie waterway, 30 km south-west of Newcastle and 120 km north of Sydney. Dora Creek has a catchment area of approximately 238 km2 and is the largest catchment flowing into the Lake Macquarie waterway which has a total catchment of 648 km2 (Figure 1).\r\nThe study area focuses on the existing township of Dora Creek and includes the townships of Cooranbong and Avondale, where new and planned rural and urban developments are proposed within the floodplain. The upper limit of the study area extends above Freemans Drive to Cooranbong and downstream to the confluence of Dora Creek with the Lake Macquarie waterway. \r\nThere are three main tributaries within the catchment with Dora Creek being joined by Jigadee Creek at Cooranbong and then Stockton Creek before draining into Lake Macquarie waterway at Bonnells Bay and Lake Eraring. \r\nWatercourses within the catchment area and above the tidal limit are narrow; Dora Creek is typically less than 15 m wide upstream of Freemans Drive. Below the tidal limit, the creeks become broader with Dora Creek varying from a width of 50m at the Sydney to Newcastle Freeway to 100m where it forms a delta into Lake Macquarie waterway. Upstream of the delta the Eraring Power station draws cooling water for steam condensation from Bonnells Bay, which passes under Dora Creek through a concrete tunnel and open canal.
提供机构:
data.nsw.gov.au



