Data Files for “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure"
收藏DataCite Commons2023-06-28 更新2025-04-09 收录
下载链接:
https://www.osti.gov/servlets/purl/1969130/
下载链接
链接失效反馈官方服务:
资源简介:
This data set includes modeling results from “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure” including region-specific [i.e., national, state, and core-based statistical area (CBSA)—cities/towns] electric vehicle supply equipment (EVSE) port count requirements in 2025 and 2030 for multiple scenarios described in the study. Please cite as: Wood, E., B. Borlaug, M. Moniot, D.-Y. Lee, Y. Ge, F. Yang, and Z. Liu. 2023. The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-85654.
提供机构:
National Renewable Energy Laboratory (NREL), Golden, CO (United States)
创建时间:
2023-04-27



