five

Dynamic Staffing and Rescheduling in Software Project Management: A Hybrid Approach

收藏
Figshare2016-06-13 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/Dynamic_Staffing_and_Rescheduling_in_Software_Project_Management_A_Hybrid_Approach/3434438
下载链接
链接失效反馈
官方服务:
资源简介:
Resource allocation could be influenced by various dynamic elements, such as the skills of engineers and the growth of skills, which requires managers to find an effective and efficient tool to support their staffing decision-making processes. Rescheduling happens commonly and frequently during the project execution. Control options have to be made when new resources are added or tasks are changed. In this paper we propose a software project staffing model considering dynamic elements of staff productivity with a Genetic Algorithm (GA) and Hill Climbing (HC) based optimizer. Since a newly generated reschedule dramatically different from the initial schedule could cause an obvious shifting cost increase, our rescheduling strategies consider both efficiency and stability. The results of real world case studies and extensive simulation experiments show that our proposed method is effective and could achieve comparable performance to other heuristic algorithms in most cases.
创建时间:
2016-06-13
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作