five

Survey report 2000/01 summer season Authors - Gary Johnston / Paul Digney / AUSLIG

收藏
Research Data Australia2024-12-14 收录
下载链接:
https://researchdata.edu.au/survey-report-200001-digney-auslig/701898
下载链接
链接失效反馈
官方服务:
资源简介:
Taken from sections of the report:IntroductionThe 2000/2001 Antarctic Geodesy Summer Program consisted of a number of distinct components. They included:- ARGN reference mark surveys at Mawson and Davis.- Orthometric height connections between the Mawson ARGN site (AUS064) and the Mawson TGBM (AUS258).- Orthometric height connections between the Davis ARGN site (AUS099) and the Davis TGBM (AUS186).- Connection by GPS to the Tide Gauge Benchmarks at Mawson, Davis and Larsemann Hills.- Strengthen the Australian Antarctic Geodetic Network with GPS observations where possible.- Establish a permanent Australian monument and connection to existing Chinese monuments in the Grove Mountains.- Connect to Russian and Chinese Geodetic control points in the Larsemann Hills vicinity for datum unification.- Derive ellipsoidal heights for lake benchmarks in the Vestfold Hills for the purpose of developing a geometric geoid model for that area.The following report details the work completed in the 2000/2001 summer season, bu AUSLIG (Now Geoscience Australia) geodetic surveyors, Gary Johnston and Paul Digney between November 2000 and March 2001.
提供机构:
Australian Antarctic Division
二维码
社区交流群
二维码
科研交流群
商业服务