Water intake cam | enclosing the intake with cement | not clear | Perforated pipe was buried and an intake box built at the point of the existing dam. Later this intake point was enclosed with concret
The study at Lemont replicated and expanded upon seismic data collected at that location in 2011 as well as evaluated the pressure field created in the water by the water gun. The replicate data were