five

Cost of Salinity to Local Infrastructure 1996-97 – Summary of component costs of salinity by reporting regions in 2000

收藏
Research Data Australia2025-12-20 收录
下载链接:
https://researchdata.edu.au/cost-salinity-local-regions-2000/3804559
下载链接
链接失效反馈
官方服务:
资源简介:
\n\nThis dataset contains 14 national surfaces, represented by 1km grids, relating\nto the cost of salinity damage to local infrastructrure. The infrastructure\ncost impacts are limited to those that occur at the location of salinity\nproblem, downstream and other offsite impacts are not covered. All dollar\nvalues are given in 1996/97 Australian dollars. Each is described as\nfollows:1. Total cost ($) to all infrastructure (buildings, road, rail and\nbridges) based on the low, abesta and high estimates of the impact of the\ncurrent (2000) extent of salinity.2. Total cost ($) to all infrastructure\n(buildings, road, rail and bridges) based on the low, abesta and high\nestimates of the impact of predicted 2020 extent of salinity3. Total cost ($)\nthe general infrastructure component (buildings etc., derived from population)\nas the abesta estimate of the impact of the current (2000) extent of\nsalinity.4. Total cost ($) the general infrastructure component (buildings\netc., derived from population) based onthe abesta estimate of the impact of\nthe predicted 2020 extent of salinity5. Total cost ($) the road component of\ninfrastructure based on the abesta estimate of the impact of the current\n(2000) extent of salinity.6. Total cost ($) the road component of\ninfrastructure based on the abesta estimate of the impact of the predicted\n2020 extent of salinity7. Total cost ($) the rail component of infrastructure\nbased on the abesta estimate of the impact of the current (2000) extent of\nsalinity.8. Total cost ($) the rail component of infrastructure based on the\nabesta estimate of the impact of the predicted 2020 extent of salinity9. Total\ncost ($) the bridge component of infrastructure based on the abesta estimate\nof the impact of the current (2000) extent of salinity.10. Total cost ($) the\nbridge component of infrastructure based on the abesta estimate of the impact\nof the predicted 2020 extent of salinity11. Total cost ($) increase to local\ninfrastructure based on the abesta estimate of the impact of the predicted\n2020 extent of salinity\n\nSee [further metadata](http://data.daff.gov.au/anrdl/metadata_files/pa_csli_r9cl\n__08012a16.xml) for more detail.\n\n
提供机构:
data.gov.au
二维码
社区交流群
二维码
科研交流群
商业服务