Table 11 - 9 in Saidabad Water Treatment Plant Project, Phase III
收藏资源简介:
Table 11-9: Preliminary cost estimates for monitoring and other mitigation activities during operational phase (Original Table 48) Parameter/ActivityFrequency of activityPreliminary cost estimatePreliminary cost for 1 year activity periodRaw water: pH, Colour, Turbidity, Ammonia, Nitrate, Phosphate, SulphateDailyTk. 6,000/- per set of measurementTk. 21,90,000/-Raw water: Lead, Chromium, Mercury, Cadmium, Total Suspended Solids, COD, BOD5, Oil & greaseOnce a monthTk. 15,000/- per set of measurementTk. 1,80,000/-Treated water: pH, Colour, Turbidity, Ammonia, Nitrate, Residual Chlorine, TC, FCDailyTk. 5,500/- per set of measurementTk. 20,07,500/-Treated water: BOD5, COD, Aluminium, Total Dissolved SolidsOnce every two monthsTk. 8,500/- per set of measurementTk. 51,000/-Sludge from Clarifiers: TCLP test and determination of Al, Pb, Cr, Cd in TCLP extractOnce every three monthsTk. 14,000/- per set of measurementTk. 56,000/-Total annual cost for monitoring during operation phaseTk. 44,84,500/- Notes: (1) The parameters listed above are based on water quality measurements of Meghna River as a part of this study. The list should be updated based on monitoring results and information on possible pollution of river water by contaminants (e.g., from an industrial source) (2) Actual monitoring time and location will be decided by DWASA and the Design Supervision Consultant (DSC) and included in the Employer’s Requirements. (3) The estimated costs are based on current rates charged by BRTC, BUET for analysis of the parameters.