Urban rail transit train operation plan is a comprehensive production plan encompassing line planning, timetabling, and rolling stock scheduling. In order to solve the problem of infeasibility of the
Global maximum power point (GMPP) tracking under shading conditions with low tracking time and reduced startup oscillations is one of the challenging tasks in photovoltaic (PV) systems. To cope with t
Urban rail transit train operation plan is a comprehensive production plan encompassing line planning, timetabling, and rolling stock scheduling. In order to solve the problem of infeasibility of the
Optimal router node placement (RNP) is an effective method for improving the performance of wireless mesh networks (WMN). However, solving the RNP problem in WMN is difficult because it is NP-hard. As