Utah FORGE: Daily Reports for the 2024 Stimulation of Wells 16A/16B(78)-32
收藏OpenEI2026-03-14 收录
下载链接:
https://data.openei.org/submissions/7715
下载链接
链接失效反馈官方服务:
资源简介:
The zip file below contains daily reports produced during the spring 2024 stimulation of wells 16A/16B(78)-32 at Utah FORGE . These reports cover a period from March 29th to April 28th, 2024. They discuss the activity on the rig each day, with each report containing information on...



