Table 9-6. Pre-mitigation impacts ImpactDisplacement of physical structureImpact natureAdverse positive NeutralImpact TypeDirect Indirect InducedThe impact is direct since houses inside the 40 m corridor of the RoW will beremoved.Impact durationTemporary PermanentThe impact is permanent since no new house will be allowed to be built insidethe 40 m corridor of the RoWImpact extentLocal Regional InternationalImpact scaleThe ESIA study has identified 1 33 houses (Tukul and CIS) to be relocated asthey are inside the 40 m corridor of the RoWFrequencyThe impact occurs only once (a one-time event)ImpactLow Medium HighmagnitudeThe magnitude of the impact is high since urban PAPs have no additional landoutside the RoW corridor to build new houses. These PAPs should get areplacement land to build new housesReceptorLow Medium HighsensitivityImpactNegligible Low ModerateHighsignificance