Bridge Deck Concrete Placement US 31 and 191st Street
收藏DataCite Commons2025-12-18 更新2025-04-16 收录
下载链接:
https://purr.purdue.edu/publications/2276/1
下载链接
链接失效反馈官方服务:
资源简介:
<p>[[Video(http://www.youtube.com/watch?v=iDNiVOWMvkY)]]</p>
<p>The construction of the bridge shown in this video is part of a $350,000,000 project that upgrades and grade-separates 13 miles of US 31 between I-465 and Indiana State Road 38.&nbsp;The upgraded 13-mile stretch features 11 new interchanges and eliminates 32 traffic signals.&nbsp;This video shows the concrete of the bridge deck being placed, worked, and cured.</p>
<p>This project is located at <a href="https://www.google.com/maps/@40.0646726,-86.1280184,461a,20y,2.8t/data=!3m1!1e3">40.0646726, -86.1280184</a>.</p>
提供机构:
Purdue University Research Repository
创建时间:
2016-11-18



