The aim of this proposal is to carry out tests of the new backend instruments which cannot be carried out during standard maintenance periods. The scheduled time is used to measure beam shapes, determ
The distance data was gathered after calibration of the bicycle simulator, through a total of 10 runs, which consisted of 5 runs in Hackett Road and 5 runs in Riverside Drive. For opening the distance