Grade uncertainty embedded in long term scheduling: stochastic mine planning
收藏DataCite Commons2021-03-27 更新2024-07-27 收录
下载链接:
https://scielo.figshare.com/articles/dataset/Grade_uncertainty_embedded_in_long_term_scheduling_stochastic_mine_planning/7898921/1
下载链接
链接失效反馈官方服务:
资源简介:
Abstract The inclusion of grade uncertainty for multivariate mineral deposits is of great importance for the correct management of subsequent decisions involved in mining planning. Mapping grade uncertainties allows maximization of profit and resource extraction. In this article, the co-simulation turning band algorithm is applied with the aim of predicting multivariate grade uncertainties. Moreover, a probabilistic analysis in long term mining sequencing is proposed in order to select the best given grade scheduling uncertainty derived from the simulations. A case study in a phosphate mine shows that the correlation of co-simulated variables honors the original data and there is an improvement in the project by an increase in Net Present Value (NPV) planning considering grade uncertainties. A comparison is performed with the results derived from the selected schedule and the results using the model based on kriged grades.
提供机构:
SciELO journals
创建时间:
2019-03-27



