遇见数据集

Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber

收藏
DataCite Commons2021-05-18 更新2025-04-09 收录
官方服务:

资源简介:

The core objectives of this project is to improve the power capture of three different wave energy conversion (WEC) devices by more than 50% using an advanced control system and validate the attained improvements using wave tank and full scale testing. In parallel, we will bring along the development of a wave prediction system that is required to enable effective control and test it at full scale. The purposes of this report are to: 1. Plan and document the 1/25th scale device testing at the wave-tank facility; 2. Document the test article, setup and methodology, sensor and instrumentation, mooring, electronics, wiring, and data flow and quality assurance; 3. Communicate the testing results between the associated members; 4. Facilitate reviews that will help to ensure all aspects (risk, safety, testing procedures, etc.); 5. Provide a systematic guide to setting up, executing and decommissioning the experiment.

创建时间:
2020-09-16
二维码
社区交流群
二维码
科研交流群
商业服务