five

The results of the general linear model analyses of leaf construction cost (CCmass), Amax, leaf carbon content (C), and leaf nitrogen content (N).

收藏
Figshare2016-03-16 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/The_results_of_the_general_linear_model_analyses_of_leaf_construction_cost_CC_sub_mass_sub_i_A_i_sub_i_max_i_sub_leaf_carbon_content_C_and_leaf_nitrogen_content_N_/3115882
下载链接
链接失效反馈
官方服务:
资源简介:
The results of the general linear model analyses of leaf construction cost (CCmass), Amax, leaf carbon content (C), and leaf nitrogen content (N).
创建时间:
2016-03-16
二维码
社区交流群
二维码
科研交流群
商业服务