five

Bridge Approach Construction Time-Lapse

收藏
DataCite Commons2025-12-18 更新2025-04-16 收录
下载链接:
https://purr.purdue.edu/publications/2267/1
下载链接
链接失效反馈
官方服务:
资源简介:
<p>[[Video(http://www.youtube.com/watch?v=YtZ3887IoX4)]]</p> <p>The construction of the bridge shown in this video is part of a $350,000,000 project that upgrades and grade-separates 13 miles of US 31 between I-465 and Indiana State Road 38. The upgraded 13-mile stretch features 11 new interchanges and eliminates 32 traffic signals. This video shows the concrete bridge deck approach construction.</p> <p>This project is located at <a href="https://www.google.com/maps/@40.0419461,-86.1356969,423a,20y,2.8t/data=!3m1!1e3">40.0419461, -86.1356969</a>.</p>
提供机构:
Purdue University Research Repository
创建时间:
2016-11-21
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作