five

BUCKLING PREVENTION STRUCTURE OF PRE-STRESSED LONG STRUCTURE

收藏
国家林业和草原科学数据中心2023-02-12 更新2024-03-07 收录
下载链接:
https://www.forestdata.cn/dataDetail.html?id=7cdf21c0-eda8-4a84-a859-5f12982ae280
下载链接
链接失效反馈
官方服务:
资源简介:
PROBLEM TO BE SOLVED: To provide a device of a simple structure for preventing buckling at the time when applying prestress to a long structure like a beam material or a column material. SOLUTION: In a pre-stressed long structure having a through-hole 11 drilled in the axial direction of a long structure 10 and applying axial compressive force by a tendon 12 inserted into the through-hole 11, tendon position holding pieces 18 are attached which hold the position of the tendon 12 in the through-hole 11 with an interval less than the buckling length of the long structure 10. The tendon position holding piece 18 can have a circular hole 18a coming into tight contact with a whole circumference of the tendon 12, and can have a horseshoe-shaped cutout 18b coming into tight contact with the tendon 12 on an opposite face of the buckling direction of the long structure 10. SELECTED DRAWING: Figure 1
提供机构:
国家林业和草原科学数据中心
创建时间:
2023-02-12
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作