[Superseded] City Plan 2014 — v35.00–2025 — LGIP — PFTI — Stormwater — Future
收藏资源简介:
[Superseded] This dataset is a single layer from [Superseded] City Plan 2014 – v35.00–2025 collection. Not all layers were updated in this amendment, for more information on past Adopted City Plan amendments. This feature layer shows Brisbane City Council LGIP future Stormwater infrastructure (map references starting with SW). This feature layer is shown on the Plans for Trunk Infrastructure - Stormwater network mapping. This feature layer includes the following categories: (a) Backflow prevention device; (b) Wetland; (c) Pipe - new; (d) Pipe - relief; (e) Natural channel lines; (f) Bioretention swale; (g) Culvert; (h) Stormwater Quality Improvement Device (SQID); (i) Concrete lined channel; (j) Land acquisition - waterway corridor; (k) Natural channel areas; (l) Rehabilitation For more information about the PFTI - stormwater infrastructure and how it is applied, please refer to the Brisbane City Plan 2014 document.



