Table- 4.12. Noise level within the power plant complex in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
收藏资源简介:
Table-4.12. Noise level within the power plant complex SL No.DateLocationsCategory of areaSite conditionConcentration Night Day time time0114-9-2010 to 15- 9-2010Project west side (inside boundary)IndustrialRunning condition67.4465.330214-9-2010 to 15- 9-2010Project east side (inside boundary)IndustrialRunning condition70.3966.170314-9-2010 to 15- 9-2010Project south side (inside boundary)IndustrialRunning condition68.1866.310414-9-2010 to 15- 9-2010Project north side (inside boundary)IndustrialRunning condition69.1167.390526-11-2010 to 27-11-2010Project west side (inside boundary)IndustrialRunning condition66.0064.270626-11-2010 to 27-11-2010Project east side (inside boundary)IndustrialRunning condition69.5065.290726-11-2010 to 27-11-2010Project south side (inside boundary)IndustrialRunning condition69.2467.380826-11-2010 to 27-11-2010Project north side (inside boundary)IndustrialRunning condition70.1566.45 Source: 450 MW CCPP environmental team measurements (2010).