soil salinity from 2015-09-16 to 2016-03-30 (NCEI Accession 0151633)
收藏官方服务:
资源简介:
The project restored both structural and habitat functions of Bayou Dupont and flanking marshes. The project created and nourished marsh and restored a ridge on the west bank of Bayou Dupont. The entire ridge will be planted with appropriate woody vegetation. Soil samples to be taken every 6 months over a 2- to 3-year period due to concerns about high salinities of the ridge soils affecting survivability of the planted woody vegetation.
创建时间:
2016-05-24



