遇见数据集
官方服务:

资源简介:

CARINYA 4 in was drilled from 28/09/2008 to 17/10/2008. A Plug and Abandonment was conducted on 17/08/2018. For P&A details, refer to (Daily Completion & Workover Reports). For Drilling details, refer to (Daily Drilling Reports).

创建时间:
2021-02-18
二维码
社区交流群
二维码
科研交流群
商业服务