cr120497
收藏资源简介:
Hector_South_East_1_2020-09-06_Stages_1-3_Hydraulic_Fracturing_Activity_Completion_Report Hector South East Stage 1 was fracture stimulated on 7 September, 2020 down 4.5” diameter P110 production casing. The targeted Toolachee PC40 was stimulated. A perforation operation was performed on 6 September, 2020 with 2.875” EHC guns. Hector South East Stage 2 was fracture stimulated on 7 September, 2020 down 4.5” diameter P110 production casing. The targeted Toolachee PC10 was stimulated. A perforation operation was performed on 7 September, 2020 with 2.875” EHC guns. Hector South East Stage 3 was fracture stimulated on 7 September, 2020 down 4.5” diameter P110 production casing. The targeted Nappamerri NU00 was stimulated. A perforation operation was performed on 7 September, 2020 with 2.875” EHC guns.



