遇见数据集

Costs and processing times of the different methods, based on 2014–2015 summer monitoring.

收藏
Figshare2016-05-26 更新2026-04-29 收录
官方服务:

资源简介:

All values were estimated on the assumption that a batch of 15 samples are analysed. Consumable costs were estimated as a ratio in comparison to IDEXX consumables.

创建时间:
2016-05-26
二维码
社区交流群
二维码
科研交流群
商业服务