Costs and processing times of the different methods, based on 2014–2015 summer monitoring.
收藏数据链接:
官方服务:
资源简介:
All values were estimated on the assumption that a batch of 15 samples are analysed. Consumable costs were estimated as a ratio in comparison to IDEXX consumables.
创建时间:
2016-05-26



