AOO No 36 / 2023
收藏资源简介:
The purpose of this contract for intellectual services is to draw up a PSMV covering an SPR area of approximately 19 hectares, which was decided on 15 June 2020. The constitution of the PSMV file is specified in Articles R 313-2 to 313-6 of the Town Planning Code. "It shall include a presentation report and a by-law, and may include planning and programming guidelines relating to built or unbuilt buildings or groups of buildings, accompanied, where appropriate, by graphic documents". The PSMV must be compatible with the development and sustainable development project of the local urban plan. It will take into account the ongoing revision of the PLU. This tranche has an execution period of 48 months until the transition to CNPA included (excluding public inquiry procedure) Five phases have been identified in this tranche which will give rise to validations at restitution meetings (meeting minutes). These phases can be treated simultaneously. The contract consists of a tranche divided into five phases: - Phase 1 - Urban, environmental, socio-economic analysis and synthesis - Phase 2 - Completion of a building file - Phase 3 - Completion of the draft regulatory dossier - Phase 4 - Follow-up of the regulatory file - Phase 5 – Mediation and consultation.



