five

CONTROL SYSTEM AND CONTROL METHOD

收藏
国家林业和草原科学数据中心2023-02-12 更新2024-03-07 收录
下载链接:
https://www.forestdata.cn/dataDetail.html?id=d146ba16-0720-4d0d-9afa-de6f4f32d07d
下载链接
链接失效反馈
官方服务:
资源简介:
PROBLEM TO BE SOLVED: To correspond to an operation state of a device for regenerating fibers and to deal with it without physically going to the installation site of the device. SOLUTION: A control system 1 includes a sheet production device 100 and a control device 200. The sheet production device 100 includes: a web forming unit for forming a web from a raw material; a web conveyance unit for conveying the web; a state detection unit for detecting the state of at least one of the web forming unit and the web conveyance unit; and a determination unit for determining presence/absence of a formation error factor of the web. The control device 200 includes: a first communication unit 201 for receiving the determination result transmitted from the sheet production device 100; and a first control unit 202 for transmitting a stop command with respect to the sheet production device 100. SELECTED DRAWING: Figure 1
提供机构:
国家林业和草原科学数据中心
创建时间:
2023-02-12
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作