遇见数据集

Data from: Resource level modifies heatwave responses in the freshwater snail Lymnaea stagnalis

收藏
Zenodo2024-02-27 更新2026-05-26 收录
官方服务:

资源简介:

Data are saved as a tab-delimited text file (data.txt). Each row represents one snail individual. The file has the following columns: 1) block - block of the experiment (2 blocks)2) food - food treatment (0 = no food, 1 = reduced food, 2 = unlimited food)3) temperature - ambient temperature during the heatwave phase of the experiment4) intial_length - shell length (mm) at the beginning of the acclimation period of the experiment5) length_start_HW - shell length (mm) at the beginning of the heatwave phase of the experiment6) length_end_HW - shell length (mm) at the end of the heatwave phase of the experiment7) length_end_recovery - shell length (mm) at the end of the recovery phase of the experiment8) respiration_end_HW - respiration rate (mg O2 h-1) at the end of the heatwave phase of the experiment9) respiration_end_recovery - respiration rate (mg O2 h-1) at the end of the recovery phase of the experiment10) eggs_HW - the number of eggs laid during the heatwave phase of the experiment11) eggs_recovery - the number of eggs laid during the recovery phase of the experiment12) antibact_end_HW - haemolymph antibacterial activity (milliunits) at the end of the heatwave phase of the experiment13) antibact_end_recovery - haemolymph antibacterial activity (milliunits) at the end of the recovery phase of the experiment14) laccase_end_HW - haemolymph laccase activity (milliunits) at the end of the heatwave phase of the experiment15) laccase_end_recovery - haemolymph laccase activity (milliunits) at the end of the recovery phase of the experiment16) PO_end_HW - haemolymph PO activity (milliunits) at the end of the heatwave phase of the experiment17) PO_end_recovery - haemolymph PO activity (milliunits) at the end of the recovery phase of the experiment18) food_consumption_end_HW - lettuce consumption (g d-1) at the end of the heatwave phase of the experiment (measured only from snails with unlimited food supply)19) food_consumption_end_recovery - lettuce consumption (g d-1) at the end of the recovery phase of the experiment (measured only from snails with unlimited food supply) Missing values in the data are denoted with "n/a".

提供机构:
Zenodo
创建时间:
2024-02-27
二维码
社区交流群
二维码
科研交流群
商业服务